Dana Point Harbor Revitalization Updates

March 03, 2021

Releases by CCC ~ Dana Point Harbor Waterside Supporting Documentation - March 03, 2021!
1. Christine Pereira - SC5 - Lighting Plan Draft 10 16 2020
2. Christine Pereira - SC6 - Additional Biological Surveys
3. Christine Pereira - SC6A - Bio Report_Dana Pt Harbor Bird-Gnatcatcher Surveys_1-8-21
4. Christine Pereira - SC6B - DanaPoint Benthic 12022020
5. Christine Pereira - SC8 - Acoustic Monitoring Plan 10 16 2020
6. Christine Pereira - SC9 - Marine Wildlife Protection Plan 10 16 2020
7. Christine Pereira - SC10 Construction Pollution Prevention Plan & Exhibits 10 16 2020
8. Christine Pereira - SC11 - Best Management Practices for Installation and Removal of Piles 10 16 2020
9. Christine Pereira - SC12 - Materials to Construct or Repair Overwater and In-Water Structures 11 17 2020
10. Christine Pereira - SC13 - BMP's for Use of Treated Wood in Overwater and In-Water Structures 11 17 2020
11. Christine Pereira - SC14 Treatment of Stormwater Runoff 11 2020
12. Christine Pereira - SC18 - Parking 12 10 2020
13. Christine Pereira - SC19 - Transition Plan for Displaced Boats During & After Dock Reconstruction 10 16 2020
14. Christine Pereira - SC25 Signage and sign mock ups 12 10 2020
15. Christine Pereira - SC26 - Big Brothers Big Sisters Letter
16. Christine Pereira - SC26 - Education and Sailing Program for Underserved Youths _REVISED
17. Christine Pereira - SC26 - OCC Sailing dana-point
18. Christine Pereira - SC26 - SF SOC CCC DPHP
19. Christine Pereira - SC26 - YMCA Dana Point Partnership Letter
20. Christine Pereira - SC27 - Marine Debris Reduction Program 12 10 2020
21. Christine Pereira - SC28 - Final Plans 1 8 2020
22. Christine Pereira - SC28B - Final Landside Coastal Commissions Submittal - 11x17 1 8 2021
23. Christine Pereira - SC28C - Final Landscape Coastal Commission Submittal 1 8 2020

July 22, 2020

BREAKING NEWS: CCC Releases Dana Point Harbor Waterside Documents - July 22, 2020!
We have received copies of the documentation submitted by Bellwether Marine submitted to the CCC.
1. 14 - Final EIR 591
2. Appendix 10A Construction Phasing (Marina) 11x17 10-7-19
3. Appendix 1A Marina Plans - 24x36 (11-14-19)
4. Appendix 2D Seawall Repair 1 24x36 (10-10-19)
5. Appendix 4A Boater Parking Plans 24x36 (10-8-19)
6. Appendix 7A WQMP Report SOC CDP WC-Island-GD
7. DRAFT SEIR
8. EIR Addendum