// any php stuff that needs to go on every page // any php stuff that needs to be at the top of the page ?>
September 9, 2020
5- 19-0971 (Dana Point Harbor Partners, LLC) (CCC Staff Report) (NEW)!
5-19-0971 (Dana Point Harbor Partners, LLC). September 9, 2020 Exhibits (NEW)!
5-19-0971 (Dana Point Harbor Partners, LLC). September 9, 2020. Correspondence (NEW)!
August 27, 2020
5- 19-0971 (Dana Point Harbor Partners, LLC) (CCC Staff Report) (NEW)!
July 22, 2020
BREAKING NEWS: CCC Releases Dana Point Harbor Waterside Documents - July 22, 2020!
We have received copies of the documentation submitted by Bellwether Marine submitted to the CCC.
(Some files are VERY Large; over 100-200K)1. 14 - Final EIR 591
2. Appendix 10A Construction Phasing (Marina) 11x17 10-7-19
3. Appendix 1A Marina Plans - 24x36 (11-14-19)
4. Appendix 2D Seawall Repair 1 24x36 (10-10-19)
5. Appendix 4A Boater Parking Plans 24x36 (10-8-19)
6. Appendix 7A WQMP Report SOC CDP WC-Island-GD
7. DRAFT SEIR
8. EIR Addendum
July 3, 2020
DPHP Revitalization NEW Marine Layout Updates Click Here, (very large file) (Updates)!
July 3, 2018
BREAKING NEWS: County Board of Supervisors Releases Dana Point Harbor P3 Dana Point Partners Staff Report - July 17th, 2018!
Approve Option Agreement with Dana Point Harbor Partners LLC and Drystack Option Agreement with Dana Point Harbor Partners Drystack LLC to conduct due diligence regarding master lease and development of Dana Point Harbor; approve Ground Lease Agreement with Dana Point Harbor Partners LLC and Drystack Lease Agreement with Dana Point Harbor Partners Drystack LLC, 66-year term to administer and manage Dana Point Harbor and initiate entitlement approvals for certain portions; authorize Chief Real Estate Officer or designee to execute the leases, agreements, related documents and amendments under certain conditions; and consider application of Final Environmental Impact Report (EIR) No. 591 and other findings - District 5
Items include the Staff Report and Attachments for Agenda Item #27:1. Agenda Item #27
2. Attachment A - Premise Map Attachments
3. Attachment B – Option Agreement for DPH Master Lease Attachments
4. Attachment C – DPH Master Lease Attachments
5. Attachment D – Drystack Area Option
6. Attachment E – Drystack Area Lease
7. Attachment F – Board Resolution No. 06-014
8. Attachment G - Senate Bill 367
9. Attachment H - Public Resources Code Section 21801
September 21, 2011
Your Dana Point Boaters Association Has Just Released The Following Documents That Have Also Been Provided And Sent To The California Coastal Commission, OCDPH, County of Orange and Other Agencies.
Revised Revitalization Plan - DPBA Proposal (9-5-11) DRAFT
Potential Recreational Boating Improvements (9-21-11) DRAFT
Slip Pricing by SF (v7) (2011)
September 20, 2011
Draft SEIR 45-Day Public Review Period (September 20 - November 4, 2011).
Written comments responding to the adequacy and appropriateness of the Draft SEIR should be delivered/sent no later than 5:00PM on November 4, 2011 to: OC Dana Point Harbor, 24650 Dana Point Harbor Drive, Dana Point, CA 92629. The Draft SEIR and supporting technical reports are available for review by interested parties below in its entirety or at ocdph.com.
OC Dana Point Harbor Attention All Interested Parties ~ Notice of Availability/Notice of Intent To Adopt a Subsequent Environmental Impact Report for the Dana Point Marina Improvement Project (NEW)!
TABLE OF CONTNETS | Download | |
1.0 | EXECUTIVE SUMMARY | Download |
2.0 | INTRODUCTION | Download |
3.0 | PROJECT DESCRIPTION | Download |
4.0 | EXISTING SETTING, IMPACTS, AND MITIGATION MEASURES
|
Download |
5.0 | ALTERNATIVES | Download |
6.0 | LONG-TERM IMPLICATIONS OF THE PROJECT | Download |
7.0 | MITIGATION MONITORING AND REPORTING PORGRAM | Download |
8.0 | CERTIFIED FINAL PROGRAM EIR NO. 591 MITIGATION | Download |
9.0 | REPORT PREPARERS | Download |
10.0 | REFERENCES | Download |
APPENDICES |
||
APPENDICES COVER | Download | |
A: | NOTICE OF PREPARTION (NOP) & NOP COMMENTS | Download |
RE-ISSUED NOTICE OF PREPARTION | Download | |
PROGRAM EIR EXECUTIVE SUMMARY | Download | |
B: | GEOLOGICAL ENGINEERING REPORT | Download |
C: | DANA POINT HARBOR BOAT TRAFFIC STUDY | Download |
D: | AIR QUALITY ANALYSIS | Download |
E: | NOISE IMPACT ANALYSIS | Download |
F: | MARINE BIOLOGICAL RESOURCES REPORT | Download |
FOCUSED SURVEY REPORT FOR EELGRASS AND INVASIVE ALGAE | Download | |
MARINE BIOLOGICAL FIELD SURVEY RESULTS | Download | |
NESTING BIRD REPORT | Download |
Dana Point Harbor
Advisory Board
Boater Liaison
Program Submission
Boater Liaison
Program Responses
County of Orange
DP Harbor Budgets
Digital News & Guides:
Log Newspaper (NEW)!
Past Issues
2024 Slip Guide (NEW)!
2023/24 Harbor Guide (NEW)!
2023 Boatyard Guide (NEW)!
Boater's Guide So. Cal.(SMBRF&DBW) (NEW)!
Bilge Pad Exchange
Local Weather Forecasts
Marine
Weather Portal
Local Marine Forecasts
Latest DP Fish Count
Local DP Web Cams
American Waterways
Watch Program
AWW Full Flyer
AWW Boater Flyer
AWW Wallet Card
ENDORSEMENTS
Mark Massara, Director
California Coastal Programs
Sierra Club
"Read Mark's
Endorsement"
Fran Gibson, Board President
Coastwalk California
California Coastal Trail
"Read Fran's
Endorsement"
FLOAT PLAN DOWNLOADS
This single full page float plan has all the information needed including a second page which includes a boating emergency guide.
USCG ~ Float Plan (.pdf)
DBW ~ Check List & Float Plan (.pdf)