Dana Point Boaters Association

 

Updated September 09, 2020
Dana Point Harbor Revitalization Updates
AND
Dana Point Harbor Marina Improvement Project

 

September 9, 2020

5- 19-0971 (Dana Point Harbor Partners, LLC) (CCC Staff Report) (NEW)!
5-19-0971 (Dana Point Harbor Partners, LLC). September 9, 2020 Exhibits (NEW)!
5-19-0971 (Dana Point Harbor Partners, LLC). September 9, 2020. Correspondence (NEW)!

August 27, 2020

5- 19-0971 (Dana Point Harbor Partners, LLC) (CCC Staff Report) (NEW)!

July 22, 2020

BREAKING NEWS: CCC Releases Dana Point Harbor Waterside Documents - July 22, 2020!
We have received copies of the documentation submitted by Bellwether Marine submitted to the CCC.
(Some files are VERY Large; over 100-200K)
1. 14 - Final EIR 591
2. Appendix 10A Construction Phasing (Marina) 11x17 10-7-19
3. Appendix 1A Marina Plans - 24x36 (11-14-19)
4. Appendix 2D Seawall Repair 1 24x36 (10-10-19)
5. Appendix 4A Boater Parking Plans 24x36 (10-8-19)
6. Appendix 7A WQMP Report SOC CDP WC-Island-GD
7. DRAFT SEIR
8. EIR Addendum

July 3, 2020

DPHP Revitalization NEW Marine Layout Updates Click Here, (very large file) (Updates)!

July 3, 2018

BREAKING NEWS: County Board of Supervisors Releases Dana Point Harbor P3 Dana Point Partners Staff Report - July 17th, 2018!
Approve Option Agreement with Dana Point Harbor Partners LLC and Drystack Option Agreement with Dana Point Harbor Partners Drystack LLC to conduct due diligence regarding master lease and development of Dana Point Harbor; approve Ground Lease Agreement with Dana Point Harbor Partners LLC and Drystack Lease Agreement with Dana Point Harbor Partners Drystack LLC, 66-year term to administer and manage Dana Point Harbor and initiate entitlement approvals for certain portions; authorize Chief Real Estate Officer or designee to execute the leases, agreements, related documents and amendments under certain conditions; and consider application of Final Environmental Impact Report (EIR) No. 591 and other findings - District 5
Items include the Staff Report and Attachments for Agenda Item #27:
1. Agenda Item #27
2. Attachment A - Premise Map Attachments
3. Attachment B – Option Agreement for DPH Master Lease Attachments
4. Attachment C – DPH Master Lease Attachments
5. Attachment D – Drystack Area Option
6. Attachment E – Drystack Area Lease
7. Attachment F – Board Resolution No. 06-014
8. Attachment G - Senate Bill 367
9. Attachment H - Public Resources Code Section 21801

 

September 21, 2011

Your Dana Point Boaters Association Has Just Released The Following Documents That Have Also Been Provided And Sent To The California Coastal Commission, OCDPH, County of Orange and Other Agencies.

Revised Revitalization Plan - DPBA Proposal (9-5-11) DRAFT
Potential Recreational Boating Improvements (9-21-11) DRAFT
Slip Pricing by SF (v7) (2011)

September 20, 2011

Draft SEIR 45-Day Public Review Period (September 20 - November 4, 2011).
Written comments responding to the adequacy and appropriateness of the Draft SEIR should be delivered/sent no later than 5:00PM on November 4, 2011 to: OC Dana Point Harbor, 24650 Dana Point Harbor Drive, Dana Point, CA 92629. The Draft SEIR and supporting technical reports are available for review by interested parties below in its entirety or at ocdph.com.

OC Dana Point Harbor Attention All Interested Parties ~ Notice of Availability/Notice of Intent To Adopt a Subsequent Environmental Impact Report for the Dana Point Marina Improvement Project (NEW)!

TABLE OF CONTNETS Download
1.0 EXECUTIVE SUMMARY Download
2.0 INTRODUCTION Download
3.0 PROJECT DESCRIPTION Download
4.0 EXISTING SETTING, IMPACTS, AND MITIGATION MEASURES
  1. LAND USE AND PLANNING
  2. GEOLOGY AND SOILS
  3. HYDROLOGY AND WATER QUALITY
  4. TRANSPORTATION AND CIRCULATION
  5. AIRQUALITY
  6. NOISE
  7. BIOLOGICAL RESOURCES
  8. AESTHETICS
  9. RECREATION
  10. HARZARDS AND HAZARDOUS MATERIALS
  11. GREENHOUSE GASES
Download
5.0 ALTERNATIVES Download
6.0 LONG-TERM IMPLICATIONS OF THE PROJECT Download
7.0 MITIGATION MONITORING AND REPORTING PORGRAM Download
8.0 CERTIFIED FINAL PROGRAM EIR NO. 591 MITIGATION Download
9.0 REPORT PREPARERS Download
10.0 REFERENCES Download

APPENDICES

APPENDICES COVER Download
A: NOTICE OF PREPARTION (NOP) & NOP COMMENTS Download
RE-ISSUED NOTICE OF PREPARTION Download
PROGRAM EIR EXECUTIVE SUMMARY Download
B: GEOLOGICAL ENGINEERING REPORT Download
C: DANA POINT HARBOR BOAT TRAFFIC STUDY Download
D: AIR QUALITY ANALYSIS Download
E: NOISE IMPACT ANALYSIS Download
F: MARINE BIOLOGICAL RESOURCES REPORT Download
FOCUSED SURVEY REPORT FOR EELGRASS AND INVASIVE ALGAE Download
MARINE BIOLOGICAL FIELD SURVEY RESULTS Download
NESTING BIRD REPORT Download